When does a consumer unit need replacing?
Older fuse boxes with rewireable fuses or plastic (rather than metal) casings don't meet current wiring regulations and are a common reason a rewire quote comes in higher than expected. A modern consumer unit uses RCBOs, which cut power to a single faulty circuit rather than the whole property.
Single phase vs three phase supply
Most UK homes run on a single-phase electricity supply, which is enough for typical household use. Larger properties, workshops, or homes adding multiple EV chargers or heavy machinery sometimes need a three-phase supply instead — this is arranged with the network operator, not just your electrician, and can take weeks.
Electrical safety for landlords
Since 2020, landlords in England must have an EICR carried out every 5 years and provide a copy to tenants. Failing to do so can result in a fine of up to £30,000. If an EICR flags unsatisfactory work, it has to be fixed within 28 days or a shorter period the report specifies.
Red flags in a cheap electrical quote
A quote significantly below the others is worth asking about before accepting — check it includes a proper consumer unit (not a budget one that doesn't meet current standards), covers making good afterwards, and includes the certificate you're entitled to for notifiable work. Cash-only, no fixed address, and no registration number are all worth asking about directly.
Electrical upgrades: EV chargers, solar PV & smart home systems
Beyond repairs, many electricians now fit EV charging points, solar PV inverters and battery storage, and smart home systems — app-controlled lighting, heating and security. These jobs usually need a separate circuit and, for EV chargers, a dedicated consumer unit way — worth checking your existing setup can support the extra load before booking.
First fix and second fix, explained
On a rewire or new build, "first fix" is running cables through walls and floors before they're closed up; "second fix" is fitting sockets, switches and light fittings once decorating is done. Getting the timing right with other trades on site avoids cables being covered before they're tested.
DIY electrical work vs when you need a professional
Under Part P of the Building Regulations, certain electrical work in a home is notifiable — it has to be carried out by a registered electrician who can self-certify it, or separately inspected by your council's building control. New circuits, consumer unit replacements, and any new work in a kitchen or bathroom are notifiable. Like-for-like socket or switch swaps usually aren't.
Electrical adaptations for accessibility
Lowering socket heights, adding lighting controls that don't need fine dexterity, and wiring in advance for a stairlift or hoist are common accessibility adaptations. Planning the electrical work alongside any wider accessibility renovation avoids re-opening walls or floors that were only just closed up.