First fix and second fix plumbing
On a new build or extension, "first fix" is running pipework through walls and floors before they're closed up; "second fix" is fitting the visible taps, radiators and appliances once decorating is done. Timing this with other trades on site matters — pipework needs to be pressure-tested before it's covered over, not after.
How long does plumbing work take?
A tap or valve replacement is usually under an hour. A full bathroom refit commonly takes 5 to 10 working days depending on scope, plus time for tiling and decorating that isn't part of the plumbing work itself. A boiler swap is typically a one-day job if it's a straightforward like-for-like replacement.
Plumbing responsibilities for landlords
Landlords are responsible for keeping water and heating systems in safe working order, and if there's a gas boiler, a valid annual Gas Safety Certificate is a legal requirement, not optional. A burst pipe or heating failure in a rented property is generally treated as an emergency repair the landlord must address promptly.
Finding a hidden leak
A leak inside a wall or under a floor isn't always obvious until it shows as a damp patch or a high water bill. Plumbers use damp meters, thermal imaging or (for harder cases) tracer gas to locate a hidden leak without having to open up an entire wall speculatively — worth asking about before agreeing to exploratory work.
Common plumbing jobs
Plumbers handle everything from a dripping tap to a full bathroom re-pipe: fixing leaks, clearing blocked drains, replacing taps and valves, fitting new bathroom suites, repairing or replacing radiators, and connecting appliances like washing machines and dishwashers. Emergency work (burst pipes, no hot water) is usually handled separately from planned jobs like a bathroom refit.
Plumbing in older and period properties
Older properties sometimes still have lead or galvanised steel pipework, which can affect both water quality and pressure, and original layouts weren't designed around modern demand for multiple bathrooms. A plumber working on a period property will often check what the existing pipework is made of before quoting for anything beyond a like-for-like repair.
What's involved in a bathroom refit
A full bathroom refit usually means removing the old suite, checking and often replacing the pipework behind it (since it's rarely accessible again once tiled over), first-fix plumbing before tiling, then second-fix (taps, shower, toilet cistern) once the room is finished. Waterproofing (tanking) around a shower area is a step worth confirming is included, not assumed.
What a boiler fault code usually means
Modern combi boilers display a fault code when something's wrong rather than just stopping — the exact meaning varies by manufacturer, but common causes behind a "no heat" code include low pressure, a faulty sensor, or an ignition fault. Note the code before calling a plumber; it speeds up diagnosis considerably.