Understanding the labour vs materials split
Materials (tiles, felt, leadwork, scaffolding hire) are often a smaller share of a re-roof quote than labour, particularly given the time and access involved. A cheap quote is worth checking for the same tile/material spec as competing quotes, not just a lower labour day rate.
Roofing guarantees, what to check
A workmanship guarantee typically runs 10 years upwards for a full re-roof, separate from any manufacturer's guarantee on the tiles or felt itself. Ask whether the guarantee is insurance-backed (protects you if the roofer goes out of business) — this varies between individual roofers and isn't automatic.
Domestic vs commercial roofing work
Most roofers who work on homes also cover garages, outbuildings and small extensions, but larger commercial flat-roof work (warehouses, larger extensions) sometimes needs a roofer with specific experience in bigger membrane systems. Worth asking directly if your job is unusually large or non-standard.
Pest and vermin entry points in roofs
Gaps around fascias, damaged soffit vents, or missing tiles are common entry points for birds, squirrels and other vermin into a loft space — a roofer doing repair work will often flag these even if they weren't the original reason for the call-out.
What a roof survey actually checks
A proper roof survey looks beyond the visible tiles — timber condition in the loft, flashing around chimneys and valleys, ventilation, and signs of past repairs. Worth requesting one before buying a property with an older roof, since problems aren't always visible from ground level or even from inside the loft.
How many quotes should you get?
Three is reasonable for most roofing jobs. For a full re-roof, make sure each quote specifies the same tile/material and includes or excludes scaffolding consistently — roofing quotes vary more than some trades simply because of what's included or left out.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Leadwork around chimneys and valleys
Lead flashing seals the joins where a roof meets a chimney, wall, or valley — a very common source of leaks when it perishes or is poorly installed, even if the roof tiles themselves are fine. If a leak keeps recurring in the same spot near a chimney, it's often the leadwork rather than the tiles that needs attention.