Roof insulation, where it goes
Loft insulation (laid flat, cheap, effective) is different from insulating the roof slope itself (needed if the loft is being converted into living space). A re-roof is often the most cost-effective time to upgrade roof-level insulation, since the covering is already off.
Understanding the labour vs materials split
Materials (tiles, felt, leadwork, scaffolding hire) are often a smaller share of a re-roof quote than labour, particularly given the time and access involved. A cheap quote is worth checking for the same tile/material spec as competing quotes, not just a lower labour day rate.
Chimney repairs and rebuilds
A leaning or spalling (crumbling brick) chimney is a structural safety issue, not just cosmetic — some roofers handle chimney repointing and rebuilding themselves, others work alongside a bricklayer. If the chimney is still in use for a flue, check whether it needs to stay swept and functional during the work.
What a roof survey actually checks
A proper roof survey looks beyond the visible tiles — timber condition in the loft, flashing around chimneys and valleys, ventilation, and signs of past repairs. Worth requesting one before buying a property with an older roof, since problems aren't always visible from ground level or even from inside the loft.
Slate, tile and other roofing materials
Natural slate is durable and often required on period or listed properties for appearance reasons, but costs more than concrete or clay tile. Metal (zinc) roofing suits modern extensions and flat/low-pitch areas. The right material often depends as much on the property's style and any planning restrictions as personal preference.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.
Red flags in a cheap roofing quote
A quote well below others, unsolicited doorstep cold-calling (especially "I noticed a problem while working nearby"), demands for cash up front before any work starts, and no fixed business address are all worth treating with caution — roofing is a trade with a higher-than-average scam rate.