Electrical upgrades: EV chargers, solar PV & smart home systems
Beyond repairs, many electricians now fit EV charging points, solar PV inverters and battery storage, and smart home systems — app-controlled lighting, heating and security. These jobs usually need a separate circuit and, for EV chargers, a dedicated consumer unit way — worth checking your existing setup can support the extra load before booking.
Understanding the labour vs materials split
Materials — consumer units, cabling, sockets, fittings — are usually a smaller share of an electrical quote than labour, particularly for jobs involving lifting floors or chasing walls. If a quote seems unusually cheap, check whether it's using a lower-spec consumer unit or cabling than a competing quote, not just a lower labour rate.
New build and extension electrical work
Wiring an extension or new build from scratch is different from rewiring an existing room — it's planned around final wall positions and fittings before plastering, so timing with your builder matters. First-fix electrical work (cabling inside walls) has to happen before plastering; second-fix (sockets, switches, fittings) after.
First fix and second fix, explained
On a rewire or new build, "first fix" is running cables through walls and floors before they're closed up; "second fix" is fitting sockets, switches and light fittings once decorating is done. Getting the timing right with other trades on site avoids cables being covered before they're tested.
LED lighting and energy-saving rewires
Swapping halogen downlights for LEDs is usually straightforward, but older dimmer switches often aren't compatible with LED drivers and need replacing alongside the bulbs, or you'll get flickering or a limited dimming range. If you're rewiring a room anyway, it's worth speccing LED-compatible circuits from the start rather than fixing dimmer compatibility later.
How long does electrical work take?
A socket or switch swap is usually under an hour. A consumer unit replacement is typically a full day, often with the power off for several hours. A full rewire in an occupied property commonly takes 5 to 10 days depending on size and access, plus time afterwards for plastering and redecorating that isn't part of the electrical work itself.
Single phase vs three phase supply
Most UK homes run on a single-phase electricity supply, which is enough for typical household use. Larger properties, workshops, or homes adding multiple EV chargers or heavy machinery sometimes need a three-phase supply instead — this is arranged with the network operator, not just your electrician, and can take weeks.
Solar panels and battery storage wiring
Solar PV and battery storage installation is specialist work, usually done by an MCS-certified installer rather than a general electrician, and needs its own isolation switches and a compliant connection to your consumer unit. Your energy supplier and network operator also need to be notified before or after installation, depending on system size.