Solar panels and battery storage wiring
Solar PV and battery storage installation is specialist work, usually done by an MCS-certified installer rather than a general electrician, and needs its own isolation switches and a compliant connection to your consumer unit. Your energy supplier and network operator also need to be notified before or after installation, depending on system size.
Smart meters and electrical work
If you're having a consumer unit replaced or a major rewire, it's worth telling your energy supplier in advance — work on the supply side sometimes needs the meter isolated by the network operator, not just your electrician, and this can take longer to arrange than the electrical work itself.
Christmas lights and extension lead safety
Overloading a single socket with extension leads and adaptors, especially outdoors or over the festive period, is one of the more common causes of a winter electrical fault. Outdoor lights need outdoor-rated (IP-rated) connectors, and it's worth having sockets checked before peak season if your property's wiring is older.
NICEIC & NAPIT registration explained
NICEIC and NAPIT are the two largest government-authorised Competent Person Schemes for electrical work in the UK. Joining requires a recognised qualification (City & Guilds 2382, the 18th Edition Wiring Regulations, plus a Level 3 NVQ and City & Guilds 2391 for inspection and testing), and ongoing assessment. A registered electrician can self-certify notifiable work without a separate council inspection.
Garage and workshop power
Running power to a detached garage or workshop means an armoured cable, usually buried, and its own consumer unit or sub-board with RCD protection at the supply end. If you're planning to run power tools or an EV charger from it, size the supply for that from the start — upgrading later usually means digging the cable run up again.
New build and extension electrical work
Wiring an extension or new build from scratch is different from rewiring an existing room — it's planned around final wall positions and fittings before plastering, so timing with your builder matters. First-fix electrical work (cabling inside walls) has to happen before plastering; second-fix (sockets, switches, fittings) after.
Electrical safety for landlords
Since 2020, landlords in England must have an EICR carried out every 5 years and provide a copy to tenants. Failing to do so can result in a fine of up to £30,000. If an EICR flags unsatisfactory work, it has to be fixed within 28 days or a shorter period the report specifies.
How electrician quotes work
Describe the job, including property type, access, and whether the work is notifiable if you know. Electricians use this to give an initial estimate, then confirm the final price after seeing the job in person — particularly for anything involving old wiring, where the scope can change once cables are exposed.