How many quotes should you get?
Three is reasonable for most roofing jobs. For a full re-roof, make sure each quote specifies the same tile/material and includes or excludes scaffolding consistently — roofing quotes vary more than some trades simply because of what's included or left out.
Roof insulation, where it goes
Loft insulation (laid flat, cheap, effective) is different from insulating the roof slope itself (needed if the loft is being converted into living space). A re-roof is often the most cost-effective time to upgrade roof-level insulation, since the covering is already off.
Signs your roof needs attention
Slipped, cracked or missing tiles, sagging in the roofline, daylight visible through the roof from the loft, and damp patches on ceilings are all signs worth having checked. A few slipped tiles is usually a repair; sagging or widespread wear across the whole roof usually points toward a full re-roof being better value than repeated repairs.
Pest and vermin entry points in roofs
Gaps around fascias, damaged soffit vents, or missing tiles are common entry points for birds, squirrels and other vermin into a loft space — a roofer doing repair work will often flag these even if they weren't the original reason for the call-out.
Roof orientation and solar suitability
A south-facing roof slope generally gets the most useful sun for solar panels, though east/west-facing roofs can still work reasonably well. A roofer or solar installer assessing suitability will look at pitch, orientation, shading from nearby trees or buildings, and roof structural capacity together.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Chimney repairs and rebuilds
A leaning or spalling (crumbling brick) chimney is a structural safety issue, not just cosmetic — some roofers handle chimney repointing and rebuilding themselves, others work alongside a bricklayer. If the chimney is still in use for a flue, check whether it needs to stay swept and functional during the work.
Why roofing work is weather-dependent
Roofers generally can't safely work in high winds, heavy rain, or icy conditions, so scheduled roofing jobs sometimes shift by a few days around bad weather — factor this into timing if you need work finished by a specific date, particularly in autumn/winter.