Background checks and identity verification
Roofing has a higher-than-average rate of doorstep cold-calling scams (particularly after storms), so checking a roofer's trading history, a verifiable business address, and reviews referencing specific local jobs matters more here than for some other trades.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Roof ventilation, why it matters
Poor roof ventilation can lead to condensation build-up in the loft space, which over time causes timber rot — a factor a roofer will often check during a re-roof, since it's a much cheaper fix to address at that point than as a standalone later repair.
Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.
Chimney repairs and rebuilds
A leaning or spalling (crumbling brick) chimney is a structural safety issue, not just cosmetic — some roofers handle chimney repointing and rebuilding themselves, others work alongside a bricklayer. If the chimney is still in use for a flue, check whether it needs to stay swept and functional during the work.
Common roofing myths, busted
"A few loose tiles are always urgent" — sometimes, but not always; a roofer can usually tell you if it can wait for a scheduled visit. "Moss means the roof needs replacing" — not necessarily, see roof cleaning above. "Flat roofs always leak eventually" — modern EPDM/rubber flat roofing lasts decades if properly installed.
Scaffolding — why it's often a separate cost
Scaffolding is frequently quoted separately from the roofing work itself, priced by roof height, access and how long it's needed. For a small repair some roofers use a tower or ladder instead, but anything involving a full re-roof or significant chimney work usually needs full scaffolding for safety and building regulations reasons.
Leadwork around chimneys and valleys
Lead flashing seals the joins where a roof meets a chimney, wall, or valley — a very common source of leaks when it perishes or is poorly installed, even if the roof tiles themselves are fine. If a leak keeps recurring in the same spot near a chimney, it's often the leadwork rather than the tiles that needs attention.