Driveway drainage regulations
Since 2008, planning permission is needed for a new or replacement driveway over 5 square metres using non-permeable material unless the water is directed to a permeable area (like a lawn) rather than the road. Permeable options (block paving with permeable jointing, gravel, resin bound) avoid this requirement — worth checking with your installer before committing to material.
Best time of year for driveway installation
Tarmac and resin installation generally prefer drier, milder conditions for proper curing — many installers have a quieter season in deep winter, which can sometimes mean better availability and slightly better pricing, though weather delays are more likely too.
Designing for multiple vehicles
A driveway needing to accommodate multiple vehicles, or occasional larger vehicles (a van, a trailer), needs base preparation and sometimes material choice suited to that heavier or more frequent loading — worth specifying actual and expected future use to your installer rather than just current needs.
Three steps to hiring the right driveway installer
First, ask to see photos of completed local jobs, ideally a few years old so you can see how the material has worn. Second, ask specifically about base preparation depth and method. Third, get a written quote covering groundwork, drainage and edging, not just the surface material.
How long does driveway installation take?
A small driveway resurfacing is often 1-2 days. A full new driveway including excavation, base preparation and surfacing commonly takes 3-7 days depending on size and material — resin and block paving generally take longer than tarmac for the same area.
How driveway quotes work
Describe the current driveway (if any), desired material, and rough size — an initial estimate can follow, but a firm quote needs a site visit to assess ground condition, drainage, and access, since these significantly affect groundwork cost beyond the visible surface material.
What affects the cost
Cost depends on material, driveway size, ground condition (excavation and disposal if the existing surface needs removing), drainage requirements, and access for machinery and material delivery. A driveway on a slope or with poor existing drainage costs more due to the groundwork involved, not just the surface material.
Background checks and identity verification
Driveway and paving work has historically had more than its share of doorstep cold-calling, particularly for tarmac and resurfacing — checking trading history, a verifiable business address, and reviews referencing specific local jobs matters more here than for some other trades.