Outdoor and garden electrics
Outdoor sockets, garden lighting, and supplies to sheds or outbuildings need weatherproof (IP-rated) fittings and their own RCD protection — standard indoor sockets and cabling aren't rated for outdoor use. This is notifiable work under Part P if it involves a new circuit.
LED lighting and energy-saving rewires
Swapping halogen downlights for LEDs is usually straightforward, but older dimmer switches often aren't compatible with LED drivers and need replacing alongside the bulbs, or you'll get flickering or a limited dimming range. If you're rewiring a room anyway, it's worth speccing LED-compatible circuits from the start rather than fixing dimmer compatibility later.
Garage and workshop power
Running power to a detached garage or workshop means an armoured cable, usually buried, and its own consumer unit or sub-board with RCD protection at the supply end. If you're planning to run power tools or an EV charger from it, size the supply for that from the start — upgrading later usually means digging the cable run up again.
Background checks and identity verification
Before comparing quotes, it's worth checking an electrician's identity and trading history, not just their qualifications — a registration number, a landline or verifiable business address, and reviews that reference specific jobs are all better signals than a mobile number alone.
Electrics in bathrooms — zone rules explained
UK wiring regulations split a bathroom into zones (0, 1, 2, and outside zones) based on distance from water, and each zone restricts what can be fitted and to what IP (ingress protection) rating. A standard socket can't go in zone 1, for example. This is why bathroom electrical work is notifiable under Part P — it's assessed against these zones, not just wired like any other room.
First fix and second fix, explained
On a rewire or new build, "first fix" is running cables through walls and floors before they're closed up; "second fix" is fitting sockets, switches and light fittings once decorating is done. Getting the timing right with other trades on site avoids cables being covered before they're tested.
Red flags in a cheap electrical quote
A quote significantly below the others is worth asking about before accepting — check it includes a proper consumer unit (not a budget one that doesn't meet current standards), covers making good afterwards, and includes the certificate you're entitled to for notifiable work. Cash-only, no fixed address, and no registration number are all worth asking about directly.
New build and extension electrical work
Wiring an extension or new build from scratch is different from rewiring an existing room — it's planned around final wall positions and fittings before plastering, so timing with your builder matters. First-fix electrical work (cabling inside walls) has to happen before plastering; second-fix (sockets, switches, fittings) after.