Understanding the labour vs materials split
Materials — consumer units, cabling, sockets, fittings — are usually a smaller share of an electrical quote than labour, particularly for jobs involving lifting floors or chasing walls. If a quote seems unusually cheap, check whether it's using a lower-spec consumer unit or cabling than a competing quote, not just a lower labour rate.
Common electrical myths, busted
"If it's not broken, the wiring's fine" — wiring can be dangerous long before it visibly fails. "Any handyman can do electrics if it's small" — scope, not size, determines whether work is notifiable. "A tripped RCD means the RCD is faulty" — usually it means something else on that circuit is, and the RCD is working as intended.
Electrical emergencies — what to do
If you smell burning, see sparks, or a breaker keeps tripping and won't reset, turn off the affected circuit and call an electrician. Don't reset a tripped breaker more than once if it trips again immediately — that usually means a fault, not a one-off.
Solar panels and battery storage wiring
Solar PV and battery storage installation is specialist work, usually done by an MCS-certified installer rather than a general electrician, and needs its own isolation switches and a compliant connection to your consumer unit. Your energy supplier and network operator also need to be notified before or after installation, depending on system size.
Electrical safety for holiday lets and Airbnbs
If you let a property short-term, insurers and booking platforms increasingly expect an in-date EICR and PAT-tested appliances, even though it isn't a blanket legal requirement the way it is for standard tenancies. Treat it the same as a rental for safety purposes — guests have less familiarity with the property than an owner-occupier would.
Electrical work and home insurance
Some insurers ask whether notifiable electrical work has been certified when you make a claim involving fire or electrical damage — keep your Electrical Installation Certificate or Building Regulations compliance certificate somewhere you can find it, not just with the electrician's paperwork.
First fix and second fix, explained
On a rewire or new build, "first fix" is running cables through walls and floors before they're closed up; "second fix" is fitting sockets, switches and light fittings once decorating is done. Getting the timing right with other trades on site avoids cables being covered before they're tested.
Garage and workshop power
Running power to a detached garage or workshop means an armoured cable, usually buried, and its own consumer unit or sub-board with RCD protection at the supply end. If you're planning to run power tools or an EV charger from it, size the supply for that from the start — upgrading later usually means digging the cable run up again.