How long does roofing work take?
A small tile repair is usually a few hours. A full re-roof on an average semi-detached house commonly takes 1-2 weeks including scaffolding, weather permitting — roofing work is one of the more weather-dependent trades, so timelines can shift.
Roofing on listed and period properties
Listed building consent is often required to change roofing material (even like-for-like sometimes needs approval if the material is being sourced differently), and conservation areas can restrict visible changes like skylights on street-facing roof slopes. Check with your local planning authority before committing to a material change.
Seasonal roof checks worth doing
Before winter: check for loose tiles and clear gutters, since blocked gutters and ice are a common combination for damage. After a storm: a visual check from the ground for obvious damage, before assuming everything's fine just because there's no visible leak yet.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Roofing emergencies — what to do
For a leak during a storm, contain the water inside (a bucket, moving belongings) rather than attempting a repair on a wet or high-wind roof yourself. Photograph any visible damage from the ground for an insurance claim before it's repaired. Tarping over a damaged section is a common temporary fix while a full repair is arranged.
Leadwork around chimneys and valleys
Lead flashing seals the joins where a roof meets a chimney, wall, or valley — a very common source of leaks when it perishes or is poorly installed, even if the roof tiles themselves are fine. If a leak keeps recurring in the same spot near a chimney, it's often the leadwork rather than the tiles that needs attention.
Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.
Understanding the labour vs materials split
Materials (tiles, felt, leadwork, scaffolding hire) are often a smaller share of a re-roof quote than labour, particularly given the time and access involved. A cheap quote is worth checking for the same tile/material spec as competing quotes, not just a lower labour day rate.