What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Roofing emergencies — what to do
For a leak during a storm, contain the water inside (a bucket, moving belongings) rather than attempting a repair on a wet or high-wind roof yourself. Photograph any visible damage from the ground for an insurance claim before it's repaired. Tarping over a damaged section is a common temporary fix while a full repair is arranged.
Conservation areas and roofing materials
Even without individual listing, a property in a conservation area can have restrictions on visible roofing changes — different tile colours, added skylights on street-facing slopes, or replacing natural slate with a synthetic alternative. Check with your local planning authority before ordering materials.
Understanding the labour vs materials split
Materials (tiles, felt, leadwork, scaffolding hire) are often a smaller share of a re-roof quote than labour, particularly given the time and access involved. A cheap quote is worth checking for the same tile/material spec as competing quotes, not just a lower labour day rate.
Signs your roof needs attention
Slipped, cracked or missing tiles, sagging in the roofline, daylight visible through the roof from the loft, and damp patches on ceilings are all signs worth having checked. A few slipped tiles is usually a repair; sagging or widespread wear across the whole roof usually points toward a full re-roof being better value than repeated repairs.
How roofing quotes work
An initial estimate can be given from photos or a description, but a firm price for anything beyond a very small repair usually needs the roofer to inspect the roof in person, often from the ground with binoculars or a drone rather than climbing up for a quote visit.
Guttering and fascias, when to replace
Guttering that overflows in heavy rain, sags, or has visible cracks is worth replacing before it causes damp at the roofline or foundations. uPVC is the common low-maintenance choice; timber fascias on older properties need repainting periodically or replacing with uPVC to reduce upkeep.
Domestic vs commercial roofing work
Most roofers who work on homes also cover garages, outbuildings and small extensions, but larger commercial flat-roof work (warehouses, larger extensions) sometimes needs a roofer with specific experience in bigger membrane systems. Worth asking directly if your job is unusually large or non-standard.