Kitchen regulations, FAQ
Do I need building control sign-off for a kitchen refit? Usually not for a like-for-like layout, but new electrical circuits need a registered electrician's certification, handled as part of that work. Can I fit my own units? Yes, unit fitting itself isn't regulated — it's the electrics and plumbing behind it that are.
Kitchen lighting layers
A well-lit kitchen usually combines general ceiling lighting, task lighting (under-cabinet lights over worktops, where most food prep happens), and sometimes accent lighting — a single central ceiling light alone often leaves worktops in shadow. Worth planning lighting circuits before, not after, unit installation.
Understanding the labour vs materials split
Units, worktop and appliances are often the largest share of a kitchen's total cost, but fitting labour, old kitchen removal, and making good around new services add up too. A cheap quote is worth checking against the same unit/worktop spec as competing quotes, not just lower labour.
Kitchen ventilation and extraction
An extractor hood vented to the outside removes cooking odours and moisture more effectively than a recirculating (filter-only) hood, but needs ducting planned into the layout — easier to arrange during a full refit than retrofit afterwards. Building Regulations require adequate ventilation in kitchens generally.
How long does a kitchen refit take?
A worktop or door replacement is usually a day or two. A full kitchen refit including new units, worktop and appliance connections commonly takes 1-3 weeks — worth planning for reduced kitchen access during this time, particularly for cooking arrangements.
What a good kitchen quote should include
A proper quote should specify unit and worktop brand/spec (not just "units, worktop"), whether appliances are supplied or just fitted, whether electrical and plumbing work is covered directly or subcontracted, and what happens if hidden issues are found once old units are removed.
Red flags in a cheap kitchen quote
A quote well below others is worth questioning — check it specifies the same unit brand/range and worktop material as competing quotes, covers who handles electrical and plumbing work, and includes disposal of the old kitchen.
Knocking through for an open-plan kitchen
Removing a wall between a kitchen and adjoining room to create an open-plan space is a structural job, not just a kitchen fitting one — it needs a structural engineer's assessment and, if the wall is load-bearing, a supporting beam, plus building control sign-off. This is usually coordinated with, not done by, the kitchen fitter directly.