Emergency glazing and boarding up
For a broken window (break-in, accident, storm damage), boarding up is usually a same-day emergency service separate from full replacement, which follows the normal survey-to-fitting timeline. Ask specifically about emergency call-out availability if security is an immediate concern, not just repair timing.
How the quote and survey process works
An initial quote is usually based on rough measurements and photos; a firm price follows an in-person survey, since window openings in older properties are rarely perfectly square or a standard size. Made-to-measure lead times are typically 2-6 weeks after survey, before installation is booked in.
Condensation on windows, what it means
Condensation on the inside of the glass is a ventilation/humidity issue in the room, not a window fault. Condensation between the panes means the sealed unit has failed. Condensation on the outside (on a cold morning) is actually a sign of a well-insulated window, not a problem.
Window regulations, FAQ
Do I need a certificate for a single window replacement? Yes, the same Part L rules apply whether it's one window or the whole house. Can I fit my own windows? Technically yes, but you'd then need a separate council building control inspection, which most installers' FENSA/CERTASS registration avoids automatically.
Common window and door jobs
Window specialists handle full window replacement, double glazing unit repairs (a fogged unit usually means a failed seal, not the whole frame), door replacement, conservatories, and draught-proofing. Composite and bifold doors are increasingly common alongside standard uPVC window replacement.
Repairing a failed seal vs full replacement
A misted glazing unit can sometimes be replaced on its own within the existing frame, which is cheaper and faster than a full window replacement — worth asking specifically if the frame itself is otherwise in good condition, rather than assuming the whole window needs replacing.
What a good window quote should include
A proper quote should state frame material and colour, glazing spec, whether old windows/frames are removed and disposed of, the FENSA/CERTASS certificate, and the guarantee length on both frames and glazing units, which can differ.
Windows in extensions and new builds
New-build glazing has to meet Part L from the outset, same as replacement windows, and is usually specified alongside the wider build rather than as an afterthought — window position and size affects room lighting and ventilation calculations the rest of the design depends on.