First fix and second fix, explained
On a rewire or new build, "first fix" is running cables through walls and floors before they're closed up; "second fix" is fitting sockets, switches and light fittings once decorating is done. Getting the timing right with other trades on site avoids cables being covered before they're tested.
What affects the cost
Cost depends on the scope of the job, how much of the property needs to be accessed, the age and condition of the existing wiring, and whether the consumer unit needs upgrading. A single socket replacement is quick and low-cost; a full rewire in an older property takes longer, partly because of the making-good work afterwards.
Powering a garden office or outbuilding
Running power to a garden office or outbuilding usually means an armoured cable buried below the recommended depth, its own small consumer unit, and RCD protection at the supply end. This is notifiable work and typically needs building control sign-off alongside the electrical certification.
Solar panels and battery storage wiring
Solar PV and battery storage installation is specialist work, usually done by an MCS-certified installer rather than a general electrician, and needs its own isolation switches and a compliant connection to your consumer unit. Your energy supplier and network operator also need to be notified before or after installation, depending on system size.
New build and extension electrical work
Wiring an extension or new build from scratch is different from rewiring an existing room — it's planned around final wall positions and fittings before plastering, so timing with your builder matters. First-fix electrical work (cabling inside walls) has to happen before plastering; second-fix (sockets, switches, fittings) after.
Electrics in bathrooms — zone rules explained
UK wiring regulations split a bathroom into zones (0, 1, 2, and outside zones) based on distance from water, and each zone restricts what can be fitted and to what IP (ingress protection) rating. A standard socket can't go in zone 1, for example. This is why bathroom electrical work is notifiable under Part P — it's assessed against these zones, not just wired like any other room.
What a good electrical quote should include
A proper quote should state the scope of work, whether it's notifiable under Part P, an itemised breakdown of labour vs materials, the certificate you'll receive on completion, and how long the job is expected to take. If a quote is missing any of these, ask before agreeing to the work.
Common electrical jobs
Electricians handle everything from minor repairs to full rewires: replacing a consumer unit to meet current wiring regulations, adding or moving sockets and light switches, installing an EV charging point, fixing faults such as tripping breakers or flickering lights, and full or partial rewires in older properties.