Three steps to hiring the right driveway installer
First, ask to see photos of completed local jobs, ideally a few years old so you can see how the material has worn. Second, ask specifically about base preparation depth and method. Third, get a written quote covering groundwork, drainage and edging, not just the surface material.
Combining materials in one driveway
Using a different material for a border or feature strip (block paving edging on a resin or tarmac driveway, for example) can give a more distinctive look at a lower cost than using the premium material throughout — worth discussing as a middle-ground option if budget is a factor.
Driveway drainage regulations
Since 2008, planning permission is needed for a new or replacement driveway over 5 square metres using non-permeable material unless the water is directed to a permeable area (like a lawn) rather than the road. Permeable options (block paving with permeable jointing, gravel, resin bound) avoid this requirement — worth checking with your installer before committing to material.
Driveway and path lighting
Outdoor lighting for a driveway needs weatherproof (IP-rated) fittings and, for anything beyond simple solar lights, a qualified electrician for the wiring — worth planning cable routes during driveway groundwork, since retrofitting cabling under a finished surface is far more disruptive.
Common driveway and paving jobs
Driveway specialists cover new driveway installation (block paving, tarmac, resin, gravel), resurfacing an existing driveway, paths, and kerb dropping to create vehicle access from a road. Repairs to cracked or sunken sections are usually a smaller, separate job from a full installation.
Tree roots and driveway heave
Established tree roots near a driveway can cause the surface to lift or crack over years, particularly with certain species known for aggressive root systems — worth discussing nearby trees with your installer, since root barriers or a different material choice can sometimes mitigate this.
Designing for multiple vehicles
A driveway needing to accommodate multiple vehicles, or occasional larger vehicles (a van, a trailer), needs base preparation and sometimes material choice suited to that heavier or more frequent loading — worth specifying actual and expected future use to your installer rather than just current needs.
Guarantees on driveway work
A workmanship guarantee on a new driveway commonly runs 5-10 years depending on material, separate from any manufacturer guarantee on specific paving products. Ask what's covered specifically — settlement or drainage issues should be included, not just surface defects.