Roof orientation and solar suitability
A south-facing roof slope generally gets the most useful sun for solar panels, though east/west-facing roofs can still work reasonably well. A roofer or solar installer assessing suitability will look at pitch, orientation, shading from nearby trees or buildings, and roof structural capacity together.
Understanding the labour vs materials split
Materials (tiles, felt, leadwork, scaffolding hire) are often a smaller share of a re-roof quote than labour, particularly given the time and access involved. A cheap quote is worth checking for the same tile/material spec as competing quotes, not just a lower labour day rate.
Roof insulation, where it goes
Loft insulation (laid flat, cheap, effective) is different from insulating the roof slope itself (needed if the loft is being converted into living space). A re-roof is often the most cost-effective time to upgrade roof-level insulation, since the covering is already off.
Common roofing jobs
Roofers handle full re-roofs, repairs to individual slipped or cracked tiles, flat roof replacement, guttering, fascias and soffits, and leadwork around chimneys and roof valleys. Emergency work — storm damage, a leak during heavy rain — is usually handled separately from planned re-roofing.
Leadwork around chimneys and valleys
Lead flashing seals the joins where a roof meets a chimney, wall, or valley — a very common source of leaks when it perishes or is poorly installed, even if the roof tiles themselves are fine. If a leak keeps recurring in the same spot near a chimney, it's often the leadwork rather than the tiles that needs attention.
Thatched roofs — a specialist trade
Thatched roofing is its own specialism, not something a general roofer typically covers — thatch has different fire safety, insurance and maintenance considerations (including regular ridge and ongoing coating work) compared to tiled or slated roofs.
How long does roofing work take?
A small tile repair is usually a few hours. A full re-roof on an average semi-detached house commonly takes 1-2 weeks including scaffolding, weather permitting — roofing work is one of the more weather-dependent trades, so timelines can shift.
How many quotes should you get?
Three is reasonable for most roofing jobs. For a full re-roof, make sure each quote specifies the same tile/material and includes or excludes scaffolding consistently — roofing quotes vary more than some trades simply because of what's included or left out.