What affects the cost
Cost depends on the scope of the job, how much of the property needs to be accessed, the age and condition of the existing wiring, and whether the consumer unit needs upgrading. A single socket replacement is quick and low-cost; a full rewire in an older property takes longer, partly because of the making-good work afterwards.
First fix and second fix, explained
On a rewire or new build, "first fix" is running cables through walls and floors before they're closed up; "second fix" is fitting sockets, switches and light fittings once decorating is done. Getting the timing right with other trades on site avoids cables being covered before they're tested.
Garage and workshop power
Running power to a detached garage or workshop means an armoured cable, usually buried, and its own consumer unit or sub-board with RCD protection at the supply end. If you're planning to run power tools or an EV charger from it, size the supply for that from the start — upgrading later usually means digging the cable run up again.
What is an EICR and do I need one?
An Electrical Installation Condition Report checks a property's wiring against current safety standards and flags anything worn, damaged or non-compliant. Landlords are legally required to get one every 5 years; homeowners aren't, but it's worth having on an older property or one you've just bought where the wiring history is unknown.
Common electrical myths, busted
"If it's not broken, the wiring's fine" — wiring can be dangerous long before it visibly fails. "Any handyman can do electrics if it's small" — scope, not size, determines whether work is notifiable. "A tripped RCD means the RCD is faulty" — usually it means something else on that circuit is, and the RCD is working as intended.
Solar panels and battery storage wiring
Solar PV and battery storage installation is specialist work, usually done by an MCS-certified installer rather than a general electrician, and needs its own isolation switches and a compliant connection to your consumer unit. Your energy supplier and network operator also need to be notified before or after installation, depending on system size.
Single phase vs three phase supply
Most UK homes run on a single-phase electricity supply, which is enough for typical household use. Larger properties, workshops, or homes adding multiple EV chargers or heavy machinery sometimes need a three-phase supply instead — this is arranged with the network operator, not just your electrician, and can take weeks.
Christmas lights and extension lead safety
Overloading a single socket with extension leads and adaptors, especially outdoors or over the festive period, is one of the more common causes of a winter electrical fault. Outdoor lights need outdoor-rated (IP-rated) connectors, and it's worth having sockets checked before peak season if your property's wiring is older.