Single phase vs three phase supply
Most UK homes run on a single-phase electricity supply, which is enough for typical household use. Larger properties, workshops, or homes adding multiple EV chargers or heavy machinery sometimes need a three-phase supply instead — this is arranged with the network operator, not just your electrician, and can take weeks.
Common electrical myths, busted
"If it's not broken, the wiring's fine" — wiring can be dangerous long before it visibly fails. "Any handyman can do electrics if it's small" — scope, not size, determines whether work is notifiable. "A tripped RCD means the RCD is faulty" — usually it means something else on that circuit is, and the RCD is working as intended.
DIY electrical work vs when you need a professional
Under Part P of the Building Regulations, certain electrical work in a home is notifiable — it has to be carried out by a registered electrician who can self-certify it, or separately inspected by your council's building control. New circuits, consumer unit replacements, and any new work in a kitchen or bathroom are notifiable. Like-for-like socket or switch swaps usually aren't.
How often should wiring be tested?
The IET recommends an electrical inspection every 10 years for an owner-occupied home, 5 years for a rented property, and on change of occupancy for some property types. A periodic inspection is different from routine maintenance — it's a formal check against current wiring regulations, not just a visual look.
Electrical emergencies — what to do
If you smell burning, see sparks, or a breaker keeps tripping and won't reset, turn off the affected circuit and call an electrician. Don't reset a tripped breaker more than once if it trips again immediately — that usually means a fault, not a one-off.
Powering a garden office or outbuilding
Running power to a garden office or outbuilding usually means an armoured cable buried below the recommended depth, its own small consumer unit, and RCD protection at the supply end. This is notifiable work and typically needs building control sign-off alongside the electrical certification.
Garage and workshop power
Running power to a detached garage or workshop means an armoured cable, usually buried, and its own consumer unit or sub-board with RCD protection at the supply end. If you're planning to run power tools or an EV charger from it, size the supply for that from the start — upgrading later usually means digging the cable run up again.
Rewiring a listed or period property
Listed building consent can be needed for chasing cable runs into original plaster or masonry, even though the electrical work itself is assessed the same way as any other property under Part P. Conduit and surface-mounted cabling are sometimes used instead of chasing into walls specifically to avoid this — worth discussing with an electrician who's worked on listed properties before.