Electrics in kitchens — circuits for appliances
A kitchen refit usually means new dedicated circuits for higher-draw appliances (oven, hob, dishwasher) rather than sharing a single ring main, plus RCD protection for anywhere near a sink. If you're changing the kitchen layout, plan socket and circuit positions before the units go in — moving them afterwards means lifting worktops or units again.
Electrical emergencies — what to do
If you smell burning, see sparks, or a breaker keeps tripping and won't reset, turn off the affected circuit and call an electrician. Don't reset a tripped breaker more than once if it trips again immediately — that usually means a fault, not a one-off.
What affects the cost
Cost depends on the scope of the job, how much of the property needs to be accessed, the age and condition of the existing wiring, and whether the consumer unit needs upgrading. A single socket replacement is quick and low-cost; a full rewire in an older property takes longer, partly because of the making-good work afterwards.
Red flags in a cheap electrical quote
A quote significantly below the others is worth asking about before accepting — check it includes a proper consumer unit (not a budget one that doesn't meet current standards), covers making good afterwards, and includes the certificate you're entitled to for notifiable work. Cash-only, no fixed address, and no registration number are all worth asking about directly.
How often should wiring be tested?
The IET recommends an electrical inspection every 10 years for an owner-occupied home, 5 years for a rented property, and on change of occupancy for some property types. A periodic inspection is different from routine maintenance — it's a formal check against current wiring regulations, not just a visual look.
Wiring a loft conversion
A loft conversion typically needs new lighting and socket circuits, often a new consumer unit way if the existing one is already at capacity, and mains-wired interlinked smoke alarms are usually required by building control as part of the sign-off, not just recommended.
How long does electrical work take?
A socket or switch swap is usually under an hour. A consumer unit replacement is typically a full day, often with the power off for several hours. A full rewire in an occupied property commonly takes 5 to 10 days depending on size and access, plus time afterwards for plastering and redecorating that isn't part of the electrical work itself.
New build and extension electrical work
Wiring an extension or new build from scratch is different from rewiring an existing room — it's planned around final wall positions and fittings before plastering, so timing with your builder matters. First-fix electrical work (cabling inside walls) has to happen before plastering; second-fix (sockets, switches, fittings) after.