Aftercare after a kitchen refit
Keep electrical certification (for new circuits) and appliance warranties together with your kitchen paperwork. Check cabinet doors and hinges after a few months of use and re-adjust if needed — a normal part of settling in that most fitters will do free of charge shortly after completion.
Kitchens as part of a wider extension
A kitchen fitted as part of a house extension needs closer coordination between the builder and kitchen fitter on timing — services (electrics, plumbing, ventilation ducting) need to be roughed in during the build phase, before the kitchen fitter's own first-fix stage begins.
Why an in-person survey matters for kitchens
Walls and floors are rarely perfectly square, especially in older properties, and a survey catches this before units are ordered to a size that won't actually fit cleanly. Skipping a proper survey in favour of a quick estimate is a common cause of on-site problems during fitting.
Kitchen regulations, FAQ
Do I need building control sign-off for a kitchen refit? Usually not for a like-for-like layout, but new electrical circuits need a registered electrician's certification, handled as part of that work. Can I fit my own units? Yes, unit fitting itself isn't regulated — it's the electrics and plumbing behind it that are.
Knocking through for an open-plan kitchen
Removing a wall between a kitchen and adjoining room to create an open-plan space is a structural job, not just a kitchen fitting one — it needs a structural engineer's assessment and, if the wall is load-bearing, a supporting beam, plus building control sign-off. This is usually coordinated with, not done by, the kitchen fitter directly.
Choosing a kitchen sink and tap
A single, larger bowl is often more practical than a traditional 1.5 bowl for modern dishwasher-owning households. A boiling water tap adds real convenience but needs a dedicated under-sink unit and its own electrical supply — worth deciding early if you want one, since it affects the plumbing and electrical first-fix.
Planning bin storage properly
Built-in pull-out bin drawers, sized for recycling separation, are far easier to plan into a layout during a refit than to add afterwards — worth deciding on bin capacity and separation needs (general waste, recycling, food waste) before cabinet layout is finalised, not after.
What a good kitchen quote should include
A proper quote should specify unit and worktop brand/spec (not just "units, worktop"), whether appliances are supplied or just fitted, whether electrical and plumbing work is covered directly or subcontracted, and what happens if hidden issues are found once old units are removed.