What a good roofing quote should include
A proper quote should specify materials (tile type, felt/underlay grade), whether scaffolding is included or separate, what happens to existing timbers if they're found to be rotten once work starts, and the guarantee length on both materials and workmanship.
What affects the cost
Cost depends on roof size and pitch (steeper roofs need more scaffolding and take longer), the material (slate costs more than concrete tile), access, and whether the existing roof structure (timbers, felt) needs work too, not just the visible covering. A straightforward repair is quick; a full re-roof including scaffolding commonly takes 1-3 weeks.
Moss and algae on roofs — repair or just clean?
Moss on a roof isn't purely cosmetic — it can hold moisture against tiles and, over years, contribute to wear. Roof cleaning can help on an otherwise sound roof, but heavy moss on an older roof sometimes indicates it's simply due for replacement rather than cleaning being a lasting fix.
Red flags in a cheap roofing quote
A quote well below others, unsolicited doorstep cold-calling (especially "I noticed a problem while working nearby"), demands for cash up front before any work starts, and no fixed business address are all worth treating with caution — roofing is a trade with a higher-than-average scam rate.
Flat roof vs pitched roof considerations
Flat roofs (felt, GRP fibreglass, or rubber/EPDM) typically need replacing more often than a pitched tiled roof, but repairs are usually quicker and cheaper. A flat roof extension on an older pitched-roof property is common and often uses a different material and roofer specialism than the main roof.
What a roof survey actually checks
A proper roof survey looks beyond the visible tiles — timber condition in the loft, flashing around chimneys and valleys, ventilation, and signs of past repairs. Worth requesting one before buying a property with an older roof, since problems aren't always visible from ground level or even from inside the loft.
How long does roofing work take?
A small tile repair is usually a few hours. A full re-roof on an average semi-detached house commonly takes 1-2 weeks including scaffolding, weather permitting — roofing work is one of the more weather-dependent trades, so timelines can shift.
Leadwork around chimneys and valleys
Lead flashing seals the joins where a roof meets a chimney, wall, or valley — a very common source of leaks when it perishes or is poorly installed, even if the roof tiles themselves are fine. If a leak keeps recurring in the same spot near a chimney, it's often the leadwork rather than the tiles that needs attention.