Electrical safety for landlords
Since 2020, landlords in England must have an EICR carried out every 5 years and provide a copy to tenants. Failing to do so can result in a fine of up to £30,000. If an EICR flags unsatisfactory work, it has to be fixed within 28 days or a shorter period the report specifies.
Do I need an electrical certificate to sell my house?
There's no legal requirement to provide one, but conveyancing solicitors routinely ask whether any electrical work done during your ownership was certified, and a missing certificate for notifiable work (a rewire, a consumer unit change, a kitchen or bathroom circuit) can hold up or complicate a sale. Keep any Electrical Installation or Building Regulations certificates with your house paperwork.
Workmanship guarantees on electrical work
Registered electricians typically offer a workmanship guarantee separate from any manufacturer's warranty on parts like consumer units or EV chargers — usually 12 months upwards. Ask what's covered specifically: a guarantee on a rewire should cover the whole job, not just the final connection.
Electrics in kitchens — circuits for appliances
A kitchen refit usually means new dedicated circuits for higher-draw appliances (oven, hob, dishwasher) rather than sharing a single ring main, plus RCD protection for anywhere near a sink. If you're changing the kitchen layout, plan socket and circuit positions before the units go in — moving them afterwards means lifting worktops or units again.
NICEIC & NAPIT registration explained
NICEIC and NAPIT are the two largest government-authorised Competent Person Schemes for electrical work in the UK. Joining requires a recognised qualification (City & Guilds 2382, the 18th Edition Wiring Regulations, plus a Level 3 NVQ and City & Guilds 2391 for inspection and testing), and ongoing assessment. A registered electrician can self-certify notifiable work without a separate council inspection.
Electrical upgrades: EV chargers, solar PV & smart home systems
Beyond repairs, many electricians now fit EV charging points, solar PV inverters and battery storage, and smart home systems — app-controlled lighting, heating and security. These jobs usually need a separate circuit and, for EV chargers, a dedicated consumer unit way — worth checking your existing setup can support the extra load before booking.
Single phase vs three phase supply
Most UK homes run on a single-phase electricity supply, which is enough for typical household use. Larger properties, workshops, or homes adding multiple EV chargers or heavy machinery sometimes need a three-phase supply instead — this is arranged with the network operator, not just your electrician, and can take weeks.
Christmas lights and extension lead safety
Overloading a single socket with extension leads and adaptors, especially outdoors or over the festive period, is one of the more common causes of a winter electrical fault. Outdoor lights need outdoor-rated (IP-rated) connectors, and it's worth having sockets checked before peak season if your property's wiring is older.