How long does a kitchen refit take?
A worktop or door replacement is usually a day or two. A full kitchen refit including new units, worktop and appliance connections commonly takes 1-3 weeks — worth planning for reduced kitchen access during this time, particularly for cooking arrangements.
Kitchen lighting layers
A well-lit kitchen usually combines general ceiling lighting, task lighting (under-cabinet lights over worktops, where most food prep happens), and sometimes accent lighting — a single central ceiling light alone often leaves worktops in shadow. Worth planning lighting circuits before, not after, unit installation.
What affects the cost
Cost depends on worktop material (laminate vs stone vs wood), whether the layout is changing (moving plumbing/electrics vs replacing in place), unit quality, and appliance integration. Moving a sink or hob position adds cost beyond the units themselves because of the pipework and electrical work involved.
Kitchen layout, the "working triangle" and beyond
The traditional advice is to keep the sink, hob and fridge in an efficient triangle so you're not crossing the kitchen constantly while cooking — still a useful starting point, though open-plan and island layouts sometimes work better with a different logic. Worth discussing how you actually use a kitchen day to day, not just the theory.
What a good kitchen quote should include
A proper quote should specify unit and worktop brand/spec (not just "units, worktop"), whether appliances are supplied or just fitted, whether electrical and plumbing work is covered directly or subcontracted, and what happens if hidden issues are found once old units are removed.
Kitchen electrics need a registered electrician
A kitchen refit usually means new dedicated circuits for higher-draw appliances (oven, hob, dishwasher) rather than sharing a ring main, plus RCD protection near the sink — this is notifiable work under Part P. If your kitchen fitter isn't a registered electrician themselves, ask who handles this part and whether they're NICEIC or NAPIT registered.
Kitchen regulations, FAQ
Do I need building control sign-off for a kitchen refit? Usually not for a like-for-like layout, but new electrical circuits need a registered electrician's certification, handled as part of that work. Can I fit my own units? Yes, unit fitting itself isn't regulated — it's the electrics and plumbing behind it that are.
How kitchen fitting quotes work
Describe the current layout and what's changing — an initial estimate can follow, but a firm price for anything beyond a straightforward like-for-like refit usually needs an in-person visit, since existing plumbing/electrical positions significantly affect cost once work starts.