Kitchen flooring options
Vinyl and laminate are budget-friendly and reasonably water-resistant. Porcelain tile is more durable and higher-end but needs a sound, flat subfloor. Engineered wood looks warmer but needs more care around water near the sink and dishwasher — worth weighing durability against look for how the kitchen is actually used.
First fix and second fix in a kitchen refit
"First fix" is pipework and electrical cabling before units go in; "second fix" is fitting appliances and connecting services once units and worktop are in place. Getting the sequence right avoids having to remove finished units to fix an overlooked service run.
Food waste disposal units, what to know
An under-sink food waste disposal unit needs its own electrical connection and specific plumbing configuration — not every kitchen sink setup can accommodate one without modification, so it's worth deciding early in the planning rather than as an afterthought once plumbing is first-fixed.
Knocking through for an open-plan kitchen
Removing a wall between a kitchen and adjoining room to create an open-plan space is a structural job, not just a kitchen fitting one — it needs a structural engineer's assessment and, if the wall is load-bearing, a supporting beam, plus building control sign-off. This is usually coordinated with, not done by, the kitchen fitter directly.
Understanding the labour vs materials split
Units, worktop and appliances are often the largest share of a kitchen's total cost, but fitting labour, old kitchen removal, and making good around new services add up too. A cheap quote is worth checking against the same unit/worktop spec as competing quotes, not just lower labour.
Three steps to hiring the right kitchen fitter
First, ask to see photos of similar completed jobs. Second, clarify exactly who handles the electrical and plumbing work. Third, get a written quote that separates units, worktop, appliances and labour, so you can see where the money's actually going.
Planning bin storage properly
Built-in pull-out bin drawers, sized for recycling separation, are far easier to plan into a layout during a refit than to add afterwards — worth deciding on bin capacity and separation needs (general waste, recycling, food waste) before cabinet layout is finalised, not after.
How long does a kitchen refit take?
A worktop or door replacement is usually a day or two. A full kitchen refit including new units, worktop and appliance connections commonly takes 1-3 weeks — worth planning for reduced kitchen access during this time, particularly for cooking arrangements.