Three steps to hiring the right kitchen fitter
First, ask to see photos of similar completed jobs. Second, clarify exactly who handles the electrical and plumbing work. Third, get a written quote that separates units, worktop, appliances and labour, so you can see where the money's actually going.
How many quotes should you get?
Three is reasonable for most kitchen jobs. For a full refit, make sure each quote specifies the same unit range and worktop material, since kitchen quotes vary enormously based on spec assumptions that aren't always stated clearly upfront.
How long does a kitchen refit take?
A worktop or door replacement is usually a day or two. A full kitchen refit including new units, worktop and appliance connections commonly takes 1-3 weeks — worth planning for reduced kitchen access during this time, particularly for cooking arrangements.
Knocking through for an open-plan kitchen
Removing a wall between a kitchen and adjoining room to create an open-plan space is a structural job, not just a kitchen fitting one — it needs a structural engineer's assessment and, if the wall is load-bearing, a supporting beam, plus building control sign-off. This is usually coordinated with, not done by, the kitchen fitter directly.
How kitchen fitting quotes work
Describe the current layout and what's changing — an initial estimate can follow, but a firm price for anything beyond a straightforward like-for-like refit usually needs an in-person visit, since existing plumbing/electrical positions significantly affect cost once work starts.
Background checks and identity verification
Since kitchen fitting isn't gated by a single mandatory certification, checking trading history, a verifiable business address, and reviews referencing specific completed jobs matters more here than for trades with a clear registration body.
Common kitchen fitting jobs
Kitchen fitters handle everything from a single worktop or cupboard door replacement to a full gut-and-refit: removing old units, fitting new cabinetry, worktops, and coordinating the plumbing and electrical work a kitchen needs (sink, dishwasher, oven, extractor). Many fitters manage the whole job and bring in a plumber or electrician for specific parts.
Planning kitchen storage during a refit
Pull-out larders, corner carousel units, and drawer-based (rather than cupboard-based) storage all make better use of available space than standard cupboards, but need planning into the layout from the start rather than added afterwards. Worth discussing storage needs before finalising unit choices.