Three steps to hiring the right kitchen fitter
First, ask to see photos of similar completed jobs. Second, clarify exactly who handles the electrical and plumbing work. Third, get a written quote that separates units, worktop, appliances and labour, so you can see where the money's actually going.
Kitchen layout, the "working triangle" and beyond
The traditional advice is to keep the sink, hob and fridge in an efficient triangle so you're not crossing the kitchen constantly while cooking — still a useful starting point, though open-plan and island layouts sometimes work better with a different logic. Worth discussing how you actually use a kitchen day to day, not just the theory.
Adding a kitchen island, what to consider
An island needs enough surrounding clearance to be usable (not just fit), and if it includes a sink or hob, plumbing and electrics need to reach it — often via the floor, which is far easier to plan during a full refit than retrofit into an existing floor later.
Planning kitchen storage during a refit
Pull-out larders, corner carousel units, and drawer-based (rather than cupboard-based) storage all make better use of available space than standard cupboards, but need planning into the layout from the start rather than added afterwards. Worth discussing storage needs before finalising unit choices.
What affects the cost
Cost depends on worktop material (laminate vs stone vs wood), whether the layout is changing (moving plumbing/electrics vs replacing in place), unit quality, and appliance integration. Moving a sink or hob position adds cost beyond the units themselves because of the pipework and electrical work involved.
Choosing a kitchen sink and tap
A single, larger bowl is often more practical than a traditional 1.5 bowl for modern dishwasher-owning households. A boiling water tap adds real convenience but needs a dedicated under-sink unit and its own electrical supply — worth deciding early if you want one, since it affects the plumbing and electrical first-fix.
Gas hobs need a Gas Safe engineer
Installing or moving a gas hob is gas work, same as a boiler, and legally needs a Gas Safe registered engineer, not just a kitchen fitter or general plumber. If you're switching from electric to gas (or vice versa) as part of a refit, this needs coordinating separately from the general fitting work.
Planning bin storage properly
Built-in pull-out bin drawers, sized for recycling separation, are far easier to plan into a layout during a refit than to add afterwards — worth deciding on bin capacity and separation needs (general waste, recycling, food waste) before cabinet layout is finalised, not after.