Kitchen lighting layers
A well-lit kitchen usually combines general ceiling lighting, task lighting (under-cabinet lights over worktops, where most food prep happens), and sometimes accent lighting — a single central ceiling light alone often leaves worktops in shadow. Worth planning lighting circuits before, not after, unit installation.
Kitchen regulations, FAQ
Do I need building control sign-off for a kitchen refit? Usually not for a like-for-like layout, but new electrical circuits need a registered electrician's certification, handled as part of that work. Can I fit my own units? Yes, unit fitting itself isn't regulated — it's the electrics and plumbing behind it that are.
How many quotes should you get?
Three is reasonable for most kitchen jobs. For a full refit, make sure each quote specifies the same unit range and worktop material, since kitchen quotes vary enormously based on spec assumptions that aren't always stated clearly upfront.
Planning bin storage properly
Built-in pull-out bin drawers, sized for recycling separation, are far easier to plan into a layout during a refit than to add afterwards — worth deciding on bin capacity and separation needs (general waste, recycling, food waste) before cabinet layout is finalised, not after.
Background checks and identity verification
Since kitchen fitting isn't gated by a single mandatory certification, checking trading history, a verifiable business address, and reviews referencing specific completed jobs matters more here than for trades with a clear registration body.
How long does a kitchen refit take?
A worktop or door replacement is usually a day or two. A full kitchen refit including new units, worktop and appliance connections commonly takes 1-3 weeks — worth planning for reduced kitchen access during this time, particularly for cooking arrangements.
Knocking through for an open-plan kitchen
Removing a wall between a kitchen and adjoining room to create an open-plan space is a structural job, not just a kitchen fitting one — it needs a structural engineer's assessment and, if the wall is load-bearing, a supporting beam, plus building control sign-off. This is usually coordinated with, not done by, the kitchen fitter directly.
Why an in-person survey matters for kitchens
Walls and floors are rarely perfectly square, especially in older properties, and a survey catches this before units are ordered to a size that won't actually fit cleanly. Skipping a proper survey in favour of a quick estimate is a common cause of on-site problems during fitting.