Kitchen regulations, FAQ
Do I need building control sign-off for a kitchen refit? Usually not for a like-for-like layout, but new electrical circuits need a registered electrician's certification, handled as part of that work. Can I fit my own units? Yes, unit fitting itself isn't regulated — it's the electrics and plumbing behind it that are.
Planning kitchen storage during a refit
Pull-out larders, corner carousel units, and drawer-based (rather than cupboard-based) storage all make better use of available space than standard cupboards, but need planning into the layout from the start rather than added afterwards. Worth discussing storage needs before finalising unit choices.
Three steps to hiring the right kitchen fitter
First, ask to see photos of similar completed jobs. Second, clarify exactly who handles the electrical and plumbing work. Third, get a written quote that separates units, worktop, appliances and labour, so you can see where the money's actually going.
Kitchen ventilation and extraction
An extractor hood vented to the outside removes cooking odours and moisture more effectively than a recirculating (filter-only) hood, but needs ducting planned into the layout — easier to arrange during a full refit than retrofit afterwards. Building Regulations require adequate ventilation in kitchens generally.
Knocking through for an open-plan kitchen
Removing a wall between a kitchen and adjoining room to create an open-plan space is a structural job, not just a kitchen fitting one — it needs a structural engineer's assessment and, if the wall is load-bearing, a supporting beam, plus building control sign-off. This is usually coordinated with, not done by, the kitchen fitter directly.
Kitchen flooring options
Vinyl and laminate are budget-friendly and reasonably water-resistant. Porcelain tile is more durable and higher-end but needs a sound, flat subfloor. Engineered wood looks warmer but needs more care around water near the sink and dishwasher — worth weighing durability against look for how the kitchen is actually used.
Why an in-person survey matters for kitchens
Walls and floors are rarely perfectly square, especially in older properties, and a survey catches this before units are ordered to a size that won't actually fit cleanly. Skipping a proper survey in favour of a quick estimate is a common cause of on-site problems during fitting.
Kitchen electrics need a registered electrician
A kitchen refit usually means new dedicated circuits for higher-draw appliances (oven, hob, dishwasher) rather than sharing a ring main, plus RCD protection near the sink — this is notifiable work under Part P. If your kitchen fitter isn't a registered electrician themselves, ask who handles this part and whether they're NICEIC or NAPIT registered.