Planning kitchen storage during a refit
Pull-out larders, corner carousel units, and drawer-based (rather than cupboard-based) storage all make better use of available space than standard cupboards, but need planning into the layout from the start rather than added afterwards. Worth discussing storage needs before finalising unit choices.
What affects the cost
Cost depends on worktop material (laminate vs stone vs wood), whether the layout is changing (moving plumbing/electrics vs replacing in place), unit quality, and appliance integration. Moving a sink or hob position adds cost beyond the units themselves because of the pipework and electrical work involved.
Kitchen plumbing and appliance connections
A new sink, dishwasher or washing machine needs its own isolation valve and a proper waste connection — moving the sink position, in particular, often means new pipework rather than just reconnecting to the old point. Check whether your fitter handles this directly or brings in a plumber.
Kitchen layout, the "working triangle" and beyond
The traditional advice is to keep the sink, hob and fridge in an efficient triangle so you're not crossing the kitchen constantly while cooking — still a useful starting point, though open-plan and island layouts sometimes work better with a different logic. Worth discussing how you actually use a kitchen day to day, not just the theory.
How long does a kitchen refit take?
A worktop or door replacement is usually a day or two. A full kitchen refit including new units, worktop and appliance connections commonly takes 1-3 weeks — worth planning for reduced kitchen access during this time, particularly for cooking arrangements.
What a good kitchen quote should include
A proper quote should specify unit and worktop brand/spec (not just "units, worktop"), whether appliances are supplied or just fitted, whether electrical and plumbing work is covered directly or subcontracted, and what happens if hidden issues are found once old units are removed.
Three steps to hiring the right kitchen fitter
First, ask to see photos of similar completed jobs. Second, clarify exactly who handles the electrical and plumbing work. Third, get a written quote that separates units, worktop, appliances and labour, so you can see where the money's actually going.
KBSA and TrustMark, what they actually mean
The KBSA (Kitchen Bathroom Bedroom Specialists Association) is the main UK trade body for the sector, though membership is limited to a few hundred companies nationally, so not every kitchen fitter will hold it. TrustMark is a broader government-endorsed scheme covering many trades — worth asking which, if either, your fitter holds rather than assuming either is standard.