How long does electrical work take?
A socket or switch swap is usually under an hour. A consumer unit replacement is typically a full day, often with the power off for several hours. A full rewire in an occupied property commonly takes 5 to 10 days depending on size and access, plus time afterwards for plastering and redecorating that isn't part of the electrical work itself.
Satisfaction and aftercare — support beyond the job
A registered electrician's paperwork doesn't end when the job does — you should receive a Building Regulations compliance certificate (for notifiable work) or an Electrical Installation Certificate, which you'll need if you sell the property or make an insurance claim. Keep this with your household paperwork.
DIY electrical work vs when you need a professional
Under Part P of the Building Regulations, certain electrical work in a home is notifiable — it has to be carried out by a registered electrician who can self-certify it, or separately inspected by your council's building control. New circuits, consumer unit replacements, and any new work in a kitchen or bathroom are notifiable. Like-for-like socket or switch swaps usually aren't.
Shared supplies in flats and converted buildings
In a converted property, it's worth checking whether your flat has its own independent consumer unit and meter, or shares a supply with other flats via a landlord's distribution board. Shared supplies can complicate straightforward jobs and sometimes need freeholder permission before any work starts — check this before booking rather than on the day.
LED lighting and energy-saving rewires
Swapping halogen downlights for LEDs is usually straightforward, but older dimmer switches often aren't compatible with LED drivers and need replacing alongside the bulbs, or you'll get flickering or a limited dimming range. If you're rewiring a room anyway, it's worth speccing LED-compatible circuits from the start rather than fixing dimmer compatibility later.
Lighting design and circuit planning
Adding recessed downlights, under-cabinet lighting or dimmer circuits usually means new cabling even if you're keeping the existing consumer unit, since older lighting circuits weren't sized for LED transformers or multiple dimmer switches. Plan lighting changes before, not after, a room's redecorated.
Understanding the labour vs materials split
Materials — consumer units, cabling, sockets, fittings — are usually a smaller share of an electrical quote than labour, particularly for jobs involving lifting floors or chasing walls. If a quote seems unusually cheap, check whether it's using a lower-spec consumer unit or cabling than a competing quote, not just a lower labour rate.
Wiring a loft conversion
A loft conversion typically needs new lighting and socket circuits, often a new consumer unit way if the existing one is already at capacity, and mains-wired interlinked smoke alarms are usually required by building control as part of the sign-off, not just recommended.