Understanding the labour vs materials split
Materials — consumer units, cabling, sockets, fittings — are usually a smaller share of an electrical quote than labour, particularly for jobs involving lifting floors or chasing walls. If a quote seems unusually cheap, check whether it's using a lower-spec consumer unit or cabling than a competing quote, not just a lower labour rate.
Electrics in kitchens — circuits for appliances
A kitchen refit usually means new dedicated circuits for higher-draw appliances (oven, hob, dishwasher) rather than sharing a single ring main, plus RCD protection for anywhere near a sink. If you're changing the kitchen layout, plan socket and circuit positions before the units go in — moving them afterwards means lifting worktops or units again.
What does an RCD do?
A residual current device cuts power within milliseconds if it detects current leaking to earth — the main protection against electric shock from a faulty appliance or damaged cable. Modern consumer units have RCD protection built in across multiple circuits (RCBOs); older ones may only protect part of the property.
How long does electrical work take?
A socket or switch swap is usually under an hour. A consumer unit replacement is typically a full day, often with the power off for several hours. A full rewire in an occupied property commonly takes 5 to 10 days depending on size and access, plus time afterwards for plastering and redecorating that isn't part of the electrical work itself.
Red flags in a cheap electrical quote
A quote significantly below the others is worth asking about before accepting — check it includes a proper consumer unit (not a budget one that doesn't meet current standards), covers making good afterwards, and includes the certificate you're entitled to for notifiable work. Cash-only, no fixed address, and no registration number are all worth asking about directly.
Single phase vs three phase supply
Most UK homes run on a single-phase electricity supply, which is enough for typical household use. Larger properties, workshops, or homes adding multiple EV chargers or heavy machinery sometimes need a three-phase supply instead — this is arranged with the network operator, not just your electrician, and can take weeks.
Rewiring a listed or period property
Listed building consent can be needed for chasing cable runs into original plaster or masonry, even though the electrical work itself is assessed the same way as any other property under Part P. Conduit and surface-mounted cabling are sometimes used instead of chasing into walls specifically to avoid this — worth discussing with an electrician who's worked on listed properties before.
Electrical safety for holiday lets and Airbnbs
If you let a property short-term, insurers and booking platforms increasingly expect an in-date EICR and PAT-tested appliances, even though it isn't a blanket legal requirement the way it is for standard tenancies. Treat it the same as a rental for safety purposes — guests have less familiarity with the property than an owner-occupier would.