Garage and workshop power
Running power to a detached garage or workshop means an armoured cable, usually buried, and its own consumer unit or sub-board with RCD protection at the supply end. If you're planning to run power tools or an EV charger from it, size the supply for that from the start — upgrading later usually means digging the cable run up again.
How many quotes should you get?
Three is the usual recommendation — enough to spot an outlier (too cheap or too expensive) without asking so many tradespeople to survey your property that it wastes everyone's time. Make sure each quote is for the same scope of work, since a lower price sometimes just means less is included.
First fix and second fix, explained
On a rewire or new build, "first fix" is running cables through walls and floors before they're closed up; "second fix" is fitting sockets, switches and light fittings once decorating is done. Getting the timing right with other trades on site avoids cables being covered before they're tested.
Electrics in bathrooms — zone rules explained
UK wiring regulations split a bathroom into zones (0, 1, 2, and outside zones) based on distance from water, and each zone restricts what can be fitted and to what IP (ingress protection) rating. A standard socket can't go in zone 1, for example. This is why bathroom electrical work is notifiable under Part P — it's assessed against these zones, not just wired like any other room.
Three steps to hiring the right electrician
First, confirm they're registered with NICEIC or NAPIT and ask to see their registration number. Second, get a written quote that itemises labour and materials separately, not just a total. Third, ask what certificate you'll receive when the work's done — for notifiable work, you're entitled to a Building Regulations compliance certificate.
Lighting design and circuit planning
Adding recessed downlights, under-cabinet lighting or dimmer circuits usually means new cabling even if you're keeping the existing consumer unit, since older lighting circuits weren't sized for LED transformers or multiple dimmer switches. Plan lighting changes before, not after, a room's redecorated.
DIY electrical work vs when you need a professional
Under Part P of the Building Regulations, certain electrical work in a home is notifiable — it has to be carried out by a registered electrician who can self-certify it, or separately inspected by your council's building control. New circuits, consumer unit replacements, and any new work in a kitchen or bathroom are notifiable. Like-for-like socket or switch swaps usually aren't.
Satisfaction and aftercare — support beyond the job
A registered electrician's paperwork doesn't end when the job does — you should receive a Building Regulations compliance certificate (for notifiable work) or an Electrical Installation Certificate, which you'll need if you sell the property or make an insurance claim. Keep this with your household paperwork.