Single phase vs three phase supply
Most UK homes run on a single-phase electricity supply, which is enough for typical household use. Larger properties, workshops, or homes adding multiple EV chargers or heavy machinery sometimes need a three-phase supply instead — this is arranged with the network operator, not just your electrician, and can take weeks.
Electrical adaptations for accessibility
Lowering socket heights, adding lighting controls that don't need fine dexterity, and wiring in advance for a stairlift or hoist are common accessibility adaptations. Planning the electrical work alongside any wider accessibility renovation avoids re-opening walls or floors that were only just closed up.
What affects the cost
Cost depends on the scope of the job, how much of the property needs to be accessed, the age and condition of the existing wiring, and whether the consumer unit needs upgrading. A single socket replacement is quick and low-cost; a full rewire in an older property takes longer, partly because of the making-good work afterwards.
Solar panels and battery storage wiring
Solar PV and battery storage installation is specialist work, usually done by an MCS-certified installer rather than a general electrician, and needs its own isolation switches and a compliant connection to your consumer unit. Your energy supplier and network operator also need to be notified before or after installation, depending on system size.
Do I need an electrical certificate to sell my house?
There's no legal requirement to provide one, but conveyancing solicitors routinely ask whether any electrical work done during your ownership was certified, and a missing certificate for notifiable work (a rewire, a consumer unit change, a kitchen or bathroom circuit) can hold up or complicate a sale. Keep any Electrical Installation or Building Regulations certificates with your house paperwork.
Workmanship guarantees on electrical work
Registered electricians typically offer a workmanship guarantee separate from any manufacturer's warranty on parts like consumer units or EV chargers — usually 12 months upwards. Ask what's covered specifically: a guarantee on a rewire should cover the whole job, not just the final connection.
Electrics in kitchens — circuits for appliances
A kitchen refit usually means new dedicated circuits for higher-draw appliances (oven, hob, dishwasher) rather than sharing a single ring main, plus RCD protection for anywhere near a sink. If you're changing the kitchen layout, plan socket and circuit positions before the units go in — moving them afterwards means lifting worktops or units again.
Electrical emergencies — what to do
If you smell burning, see sparks, or a breaker keeps tripping and won't reset, turn off the affected circuit and call an electrician. Don't reset a tripped breaker more than once if it trips again immediately — that usually means a fault, not a one-off.