Planning kitchen storage during a refit
Pull-out larders, corner carousel units, and drawer-based (rather than cupboard-based) storage all make better use of available space than standard cupboards, but need planning into the layout from the start rather than added afterwards. Worth discussing storage needs before finalising unit choices.
Knocking through for an open-plan kitchen
Removing a wall between a kitchen and adjoining room to create an open-plan space is a structural job, not just a kitchen fitting one — it needs a structural engineer's assessment and, if the wall is load-bearing, a supporting beam, plus building control sign-off. This is usually coordinated with, not done by, the kitchen fitter directly.
Adding a kitchen island, what to consider
An island needs enough surrounding clearance to be usable (not just fit), and if it includes a sink or hob, plumbing and electrics need to reach it — often via the floor, which is far easier to plan during a full refit than retrofit into an existing floor later.
Kitchen electrics need a registered electrician
A kitchen refit usually means new dedicated circuits for higher-draw appliances (oven, hob, dishwasher) rather than sharing a ring main, plus RCD protection near the sink — this is notifiable work under Part P. If your kitchen fitter isn't a registered electrician themselves, ask who handles this part and whether they're NICEIC or NAPIT registered.
Workmanship guarantees on kitchen fitting
Ask what's covered by a workmanship guarantee specifically — unit installation and worktop fitting should be explicitly included. Appliance manufacturer warranties are separate and worth registering promptly; some require registration within a set period after installation to be valid.
Planning bin storage properly
Built-in pull-out bin drawers, sized for recycling separation, are far easier to plan into a layout during a refit than to add afterwards — worth deciding on bin capacity and separation needs (general waste, recycling, food waste) before cabinet layout is finalised, not after.
Common kitchen fitting jobs
Kitchen fitters handle everything from a single worktop or cupboard door replacement to a full gut-and-refit: removing old units, fitting new cabinetry, worktops, and coordinating the plumbing and electrical work a kitchen needs (sink, dishwasher, oven, extractor). Many fitters manage the whole job and bring in a plumber or electrician for specific parts.
How long does a kitchen refit take?
A worktop or door replacement is usually a day or two. A full kitchen refit including new units, worktop and appliance connections commonly takes 1-3 weeks — worth planning for reduced kitchen access during this time, particularly for cooking arrangements.