How long does a kitchen refit take?
A worktop or door replacement is usually a day or two. A full kitchen refit including new units, worktop and appliance connections commonly takes 1-3 weeks — worth planning for reduced kitchen access during this time, particularly for cooking arrangements.
Kitchen layout, the "working triangle" and beyond
The traditional advice is to keep the sink, hob and fridge in an efficient triangle so you're not crossing the kitchen constantly while cooking — still a useful starting point, though open-plan and island layouts sometimes work better with a different logic. Worth discussing how you actually use a kitchen day to day, not just the theory.
Understanding the labour vs materials split
Units, worktop and appliances are often the largest share of a kitchen's total cost, but fitting labour, old kitchen removal, and making good around new services add up too. A cheap quote is worth checking against the same unit/worktop spec as competing quotes, not just lower labour.
Knocking through for an open-plan kitchen
Removing a wall between a kitchen and adjoining room to create an open-plan space is a structural job, not just a kitchen fitting one — it needs a structural engineer's assessment and, if the wall is load-bearing, a supporting beam, plus building control sign-off. This is usually coordinated with, not done by, the kitchen fitter directly.
Choosing a worktop material
Laminate is the budget-friendly option and has improved significantly in appearance. Wood/laminate needs more care around water exposure near sinks. Stone (granite, quartz) is durable and heat-resistant but costs considerably more and is usually templated and fitted by a specialist worktop company, not the kitchen fitter directly.
Registering appliance warranties promptly
Many appliance manufacturers require warranty registration within a set period (often 30-90 days) after installation to be valid — worth doing this as soon as appliances are fitted rather than assuming purchase alone activates the warranty automatically.
Kitchen lighting layers
A well-lit kitchen usually combines general ceiling lighting, task lighting (under-cabinet lights over worktops, where most food prep happens), and sometimes accent lighting — a single central ceiling light alone often leaves worktops in shadow. Worth planning lighting circuits before, not after, unit installation.
Kitchen plumbing and appliance connections
A new sink, dishwasher or washing machine needs its own isolation valve and a proper waste connection — moving the sink position, in particular, often means new pipework rather than just reconnecting to the old point. Check whether your fitter handles this directly or brings in a plumber.