Outdoor and garden electrics
Outdoor sockets, garden lighting, and supplies to sheds or outbuildings need weatherproof (IP-rated) fittings and their own RCD protection — standard indoor sockets and cabling aren't rated for outdoor use. This is notifiable work under Part P if it involves a new circuit.
New build and extension electrical work
Wiring an extension or new build from scratch is different from rewiring an existing room — it's planned around final wall positions and fittings before plastering, so timing with your builder matters. First-fix electrical work (cabling inside walls) has to happen before plastering; second-fix (sockets, switches, fittings) after.
Lighting design and circuit planning
Adding recessed downlights, under-cabinet lighting or dimmer circuits usually means new cabling even if you're keeping the existing consumer unit, since older lighting circuits weren't sized for LED transformers or multiple dimmer switches. Plan lighting changes before, not after, a room's redecorated.
Garage and workshop power
Running power to a detached garage or workshop means an armoured cable, usually buried, and its own consumer unit or sub-board with RCD protection at the supply end. If you're planning to run power tools or an EV charger from it, size the supply for that from the start — upgrading later usually means digging the cable run up again.
How often should wiring be tested?
The IET recommends an electrical inspection every 10 years for an owner-occupied home, 5 years for a rented property, and on change of occupancy for some property types. A periodic inspection is different from routine maintenance — it's a formal check against current wiring regulations, not just a visual look.
Electrics in bathrooms — zone rules explained
UK wiring regulations split a bathroom into zones (0, 1, 2, and outside zones) based on distance from water, and each zone restricts what can be fitted and to what IP (ingress protection) rating. A standard socket can't go in zone 1, for example. This is why bathroom electrical work is notifiable under Part P — it's assessed against these zones, not just wired like any other room.
Electrical safety for landlords
Since 2020, landlords in England must have an EICR carried out every 5 years and provide a copy to tenants. Failing to do so can result in a fine of up to £30,000. If an EICR flags unsatisfactory work, it has to be fixed within 28 days or a shorter period the report specifies.
Solar panels and battery storage wiring
Solar PV and battery storage installation is specialist work, usually done by an MCS-certified installer rather than a general electrician, and needs its own isolation switches and a compliant connection to your consumer unit. Your energy supplier and network operator also need to be notified before or after installation, depending on system size.