What's involved in a bathroom refit
A full bathroom refit usually means removing the old suite, checking and often replacing the pipework behind it (since it's rarely accessible again once tiled over), first-fix plumbing before tiling, then second-fix (taps, shower, toilet cistern) once the room is finished. Waterproofing (tanking) around a shower area is a step worth confirming is included, not assumed.
Plumbing regulations, FAQ
Do I need a certificate for a new bathroom? There's no single certificate like Part P for electrics, but any work must comply with Water Fittings Regulations, and gas-connected work needs a Gas Safe engineer. Can I do my own plumbing? Straightforward repairs, yes; anything affecting the public water supply (like a new connection) should go through a WaterSafe-approved plumber.
What affects the cost
Cost depends on the scope of the job, how accessible the pipework is (under a floor vs behind a wall), whether parts need to be sourced specially, and whether the job is planned or an emergency call-out. A simple tap or valve replacement is usually quick and low-cost; anything requiring pipework to be rerouted, or walls/floors to be opened up, costs more partly because of the making-good work afterwards.
How plumbing quotes work
Describe the job, including whether it's an emergency, a planned repair, or a full installation, and mention access — under a suspended floor is very different from behind fitted units. Plumbers use this for an initial estimate; the final price is usually confirmed once they've seen the fault or the space in person.
When plumbing work needs a Gas Safe engineer instead
Plumbers can install and repair most water systems, but any work on a gas appliance or gas pipework — a boiler, a gas fire, a gas hob — is illegal for anyone who isn't on the Gas Safe Register, by law. If a job involves both plumbing and a gas connection (moving a boiler, for example), check whether your plumber is also Gas Safe registered before booking.
How long does plumbing work take?
A tap or valve replacement is usually under an hour. A full bathroom refit commonly takes 5 to 10 working days depending on scope, plus time for tiling and decorating that isn't part of the plumbing work itself. A boiler swap is typically a one-day job if it's a straightforward like-for-like replacement.
Low water pressure — common causes
Low pressure can come from a partially closed stopcock, a fault with the water company's supply, scale build-up in old pipework, or (for a shower specifically) the type of shower valve fitted. A plumber can usually diagnose which of these it is by checking pressure at more than one fixture, rather than assuming it's the mains supply.
What a good plumbing quote should include
A proper quote should state the scope of work, whether parts are included in the price or charged separately, an estimate of how long the job will take, and what happens if the job turns out to be bigger than expected once work starts (a common scenario with older pipework).